474 homes across 3 towers, just a 2-minute walk to Lentor MRT in the fast-growing Lentor Hills Estate.
The information is subject to change and is for illustration purposes only.
Forsea Residence Pte. Ltd., a JV of Soilbuild Group Holdings and United Engineers.
See Developer →Hillock Green is a 99-year leasehold development of 474 units on a 144,714 sqft site with a plot ratio of 3.0, just a 2-minute walk to Lentor MRT (Thomson-East Coast Line).
Hillock Green is one of the closest new launches to Lentor MRT, just a 2-minute walk away on the Thomson-East Coast Line, right in the heart of the fast-growing Lentor Hills Estate.
As part of a new township master-planned around greenery and pedestrian connectivity, Hillock Green sits alongside several other new Lentor launches, giving the area a critical mass of new amenities, schools and parks as the precinct matures over the next few years.
Dining and groceries — at a glance.
Live activity pulled straight from URA's transaction data — not something you'll find on a typical listings site.
Hillock Green offers a wide spread of layouts from 1-Bedroom to 4-Bedroom Premium, including several with studies.
Total of 474 units. Estimated monthly maintenance fees range from S$300 for 1-Bedroom units, S$360 for 2- and 3-Bedroom units, up to S$420 for 3-Bedroom Premium and 4-Bedroom units.
Hillock Green is developed by Forsea Residence Pte. Ltd., a joint venture between Soilbuild Group Holdings Ltd. and United Engineers Limited, both established Singapore-listed property and engineering groups.
The development is designed by DP Architects Pte Ltd, one of Asia's largest and most experienced architectural practices, known for large-scale residential and mixed-use developments across Singapore.
“Have a very pleasant experience with Charlene as my advisor. She helped me to sell my property and provided details on the current market condition and what price I can look at.”
Leave your details for the complete e-brochure, floor plans, and a personalised walkthrough of what's still available — or skip straight to WhatsApp.
Launch details compiled from public sources as of Jul 2026 and may change. Please contact Charlene for the latest prices, unit availability and official developer materials.